We modernize outdated PLCs, drives, and HMIs to improve reliability, reduce downtime, and simplify troubleshooting. Options include:
• PLC upgrades (from Siemens S5 to S7 with TIA Portal and HMI integration)
• Drive upgrades (replacement of obsolete AC/DC drives with modern Siemens or Parker units)
Complete control panel replacement for maximum machine utilization and simplified maintenance eliminating obsolete analog synchronization boards and aged components.